← Back to David’s websiteSYSTEMS LAB / 01

BEECHCRAFT KING AIR · C90A/B SYSTEM

King Air C90A/B Electrical System.

Follow the power. Change a switch. See what stays alive.

EDUCATIONAL MODELC90A/B electrical architecture
and FlightSafety Rev 1.2 excerpts
Study the C90A/B architecture, not an operating procedure. Other King Air models use different electrical architectures. Serial number and modifications matter. Use the applicable AFM and approved checklist for actual operation.
00:00

MODEL READOUTS · remain visible for learning even without panel power

0.00× 250 A
0 A
0.00× 250 A
0 A
24.0V DC
Ideal nominal bus voltage
−37A
Discharging · + charge / − discharge

BAT MASTER

Relay + battery bus tie

LEFT ENGINE / GENERATOR

Engine stoppedSTART ON assumes fuel / ignition

RIGHT ENGINE / GENERATOR

Engine stoppedSTART ON assumes fuel / ignition

GEN TIES

Generator ties only

BUS SENSE

Momentary pulses only

EXTERNAL POWER

28.25 V nominal
GPU interlocks abstracted

START ON cranks, then starts the engine in an illustrative 8-second sequence with fuel and ignition assumed. The starter stays engaged after the engine runs. Set START OFF before generator RESET; leaving START ON blocks GCU engagement. STARTER ONLY does not start the engine.

ANNUNCIATOR PANEL

Power distribution

Tap a component to inspect or fault it. Swipe sideways in Detail view.

Live pathUnpowered / openFault / protection latchCoil commandHED interruptionMoving dashes = power current · gray links = mechanical
Wire currents are illustrative. HED arrows show sensing direction; separate dashed links show relay control.

What just happened

Controls and protection events, newest first.

    Illustrative loads

    Adjust bus demand to watch load sharing and battery drain. These are teaching values, not aircraft load data.

    Hot battery loads remain connected with BAT OFF. Generator and center-bus equipment lists were not in the supplied table.

    How to read this lab

    Try these experiments

    1. With battery only, notice the dark generator buses. Tap MAN CLOSE to restore them and compare battery current.
    2. Load both generators. Switch one OFF: its line contactor opens while both generator buses stay powered.
    3. Tap BUS SENSE TEST. The ties latch open, but each operating generator still supplies its own bus and a triple-fed leg.
    4. Inject a generator-bus fault. Watch the directional HED isolate incoming power. Its own generator is a separate source.
    5. Load right cross-start. Follow the bypass around the operating side’s tie and 250 A limiter. HEDs stay in the current path with sensing inhibited.

    Source and boundaries

    Adapted from the supplied DC schematic and FlightSafety International King Air C90A/B/GT Pilot Training Manual, Revision 1.2, pages 2-7, 2-8, and 2-11 through 2-15. Training reference, not AFM authority.

    The model uses a connected circuit graph, one-way triple-fed diodes, discrete contactor control and retained protection state. Normal generator voltage is represented as 28.25 V; battery-only voltage as 24 V. Faulted paths show unsolved voltage; only independent paths that avoid faulted buses count as reliable feeds. Voltage drop, source impedance, contactor travel, voltage-matching transients and detailed aircraft interlocks are not solved.

    Parallel connected generators share modeled demand equally. The manual gives a 2.5% sharing tolerance. Cranking demand (360 A), running-engine starter demand (60 A while START remains selected), fault demand (1,100 A), equal source contribution during starts and limiter opening delays (0.45 / 0.75 s) are visual teaching assumptions, not performance predictions. No endurance estimate is provided.

    Important details

    Blue dashed paths show coil commands, gold dotted paths show HED interruption, and solid gray rods connect a relay coil mechanically to its power contact. These are functional control relationships, not terminal-by-terminal aircraft wiring. BAT controls the battery relay and battery bus tie separately.

    Hall sensors detect only the marked direction at 275 ±5 A. The manual’s 10 ms generator / 12 ms battery values describe sensor reaction, not total contact opening time. Protection is inhibited during start.

    TEST and RESET are momentary here. Holding TEST can damage sensors; holding RESET inhibits sensing and may allow contact welding or limiter opening. Real GEN TIES OPEN has a lever lock, not represented here.

    START ON assumes automatic fuel introduction and ignition. Its 8-second cranking/acceleration sequence is a teaching approximation, not aircraft start timing, Ng/RPM thresholds or an operating procedure. Engine light-off does not move the maintained START switch: the pilot must set START OFF to release the starter and remove the GCU inhibit. HED sensing remains inhibited while either START switch is selected. A reliable electrical feed is required throughout; failed or seized starters and loss of power interrupt engine light-off but do not automatically move START OFF. The selected starter can draw current again when power returns; cycle START OFF before a deliberate retry. No automatic starter protection is simulated. STARTER ONLY motors without light-off. Generator RESET remains manual. Detailed fuel, temperature, RPM and starter duty-cycle enforcement are outside this electrical model. Source-listed starter duty cycle: 40 s on / 1 min off, twice; third 40 s on, then 30 min off. Verify the applicable AFM.

    The battery-charge annunciator is modeled only for the selected Ni-Cad configuration: more than 7 A for at least 6 s. Serial-specific applicability must be checked. AC/inverter distribution is outside this DC lab.